The Upgrade Is Not Finished Until the Results Are Verified

By Mark Boucher | CMM Quarterly


We would question a measurement taken with an unqualified probe. We should bring that same discipline to the software that processes, presents, and distributes our results.

ZEISS lists October 15, 2026, as the end-of-support date for PiWeb 2025.R2. That does not mean installed software suddenly stops working or that previously issued reports become invalid. It does mean users should review their support position and plan their next step. (zeiss.com⁠)

The decision deserves more attention than choosing a convenient afternoon for installation.

A measurement result travels through several stages before someone uses it to accept a part or adjust a process. The CMM evaluates the characteristic. An import process transfers the data. A report displays the result, and perhaps a statistical calculation or alarm prompts further action. Each stage depends on settings that someone selected.

When software changes, we need evidence that this chain still works as intended.

That is not an argument against upgrading. New capabilities can be valuable. PiWeb 2026.R2, for example, offers expanded statistical methods, redesigned statistical configuration, and customizable alarm rules with test-run previews. Those tools deserve consideration. Their usefulness, however, depends on correct configuration and people who understand the results. (zeiss.com⁠)

A clean-looking report is not sufficient verification.

Start with data whose expected results have been independently checked. Include accepted and rejected characteristics, unequal tolerances, and results close to a tolerance limit. Confirm that characteristic names, units, nominal values, and tolerance directions survive the transfer. Check whether displayed rounding could hide a small deviation even though the underlying acceptance decision remains correct.

The purpose is not simply to make the new report resemble the old one. The old configuration may contain an error. The purpose is to demonstrate that the new system produces the intended result—and to investigate differences rather than dismiss them.

Statistical reporting needs particular care. Two reports can use the same measurements and produce different capability values because their calculation settings differ. Before treating that difference as a software problem, establish which method each report uses and whether it suits the process being evaluated. A capability index should never become authoritative merely because software printed it.

Alarms introduce another responsibility.

An automated notification can shorten the time between detecting a problem and bringing it to someone’s attention. But a notification is not a disposition. It does not identify the cause, authorize rework, or document approval to release a part.

A useful test follows the event beyond the screen. Does the intended person receive the notification? Can that person identify the affected part and characteristic? What happens if delivery fails? Where is the response recorded?

These questions matter whether the workflow uses PiWeb, a spreadsheet, or another reporting system. Automation should support a defined responsibility, not leave everyone assuming that someone else handled the rejection.

Training must address those responsibilities as well as the new controls. Showing an operator where to find a setting is only the beginning. The operator also needs to understand what that setting changes, when it should be used, and when a result requires investigation.

Before returning an updated system to production, preserve an appropriate backup, document the configuration, retain the verification evidence, and establish a recovery plan. The depth of that work should reflect the risk and the customer’s requirements. A revised page layout and a changed statistical calculation do not necessarily require the same testing.

The question worth asking about an upgrade is not simply, “What is new?”

It is, “What have we verified?”

The installation may finish in minutes. Confidence in the results must be earned.

Add this section at the end of the editorial:

References

  1. ZEISS. “Software Product Discontinuation.” Lists software lifecycle dates, including the October 15, 2026, end of support for PiWeb 2025.R2. Accessed October 19, 2026.
    https://www.zeiss.com/metrology/en/services/software-product-discontinuation.html

  2. ZEISS. “ZEISS PiWeb 2026.R2 — New Highlight Features.” Describes expanded statistical calculations, redesigned statistical configuration, and customizable alarm rules with test-run previews. Accessed October 19, 2026.
    https://www.zeiss.com/metrology/en/software/zeiss-piweb/release-notes.html


Previous
Previous

Verisurf Joins DMSC: Strengthening the Digital Thread Between CAD and CMM Inspection

Next
Next

From Inspection to Orbit: Measurement as the Engine of Scalable Space Manufacturing